Workshop: Simulation Tbm Tunneling In Abaqus

In this video, you will see the full details of a TBM (Tunnel Boring Machine) simulation in Abaqus. The video is in English. The analysis is divided into two parts: the soil and the liner.

The simulation is carried out in six stages. During the process, the soil section is removed from the original model, and the liner section is added. To define the soil weight, the GEOSTATIC step is used.

At the end, you can view several images showing the results of the analysis.